The Lakes & Dams Committee is please to announce that the construction phase is now complete- the riser tower height has been corrected by the vendor (at no cost to Twin lakes), which will result in a lower water elevation.
The lower valve has now been closed again, and the lake has been refilling since Monday (June 15). This should take about another week, with a little help from all the rain in the forecast.
Stay tuned here for the official re-opening of the lake to all Twin Lakes residents, when our final and permanent water elevation is reached.